Step 1
Before GOH fabrication based on 9-points GOH container inspection.

Step 2
Before GOH installation they discuss how to do and suppose GOH instruction.

Step 3
Clean the floor and checking for some waste material.

Step 4
Carry the material.

Step 5
They making the measurement according to the GOH instruction.

Step 6
Carry the hollow pipe

Step 7
They install materials and then checking safety.

Step 8
This welder is well do for his duty and his safety.

Step 9
Welding for “To stay one’s hand”

Step 10
Gird the flat bar.

Step 11
Affix the celling roof

Step 12
Affix the wall.

Step 13
Affix the floor .

Step 14
First clean the inside door and then affixing the plastic by using special adhesive.

Step 15
Finally inside the door affix the GOH check list form by using double tape.

Step 16
Already finished for GOH fabrication(Double Bar).